Design / engineering / supply complete hot water system for water production line.
On July 25, 2018, SaturnEC has handed over the 400 kW boiler system, included pumps, tanks, piping system of hot water station, for the purified water production line at Satori - Long Hau Industrial Park - Long An.
The Electric hot water boiler capacity of 400kw, was delivered from reputable partner in Korea, combined with local sub-contractor to complete auxiliary components, piping, and full automation control system.
The system was hot tested for long period 30 days, before commissioning and handling to customer. The system had achieved initial design parameters and also was issued a National Accreditation Certificate for environmental safety, and energy saving equipment.
Model: Electric Boiler: 400kW